Build & Deploy
From empty space to operational environment—executed to exacting standards.
The Challenge
Infrastructure deployment is where plans meet reality—and where the gap between design intent and field execution creates lasting problems. A cable tray installed six inches off specification blocks future expansion. A power circuit terminated without proper torque fails under load.
The pressure to move fast compounds these risks. Business timelines don’t account for the careful, methodical work that mission-critical infrastructure requires. And the consequences don’t appear immediately—they surface months or years later.
AI and GPU infrastructure raises the stakes further. Power densities that overwhelm conventional designs. Cooling requirements that demand liquid distribution where none existed. Equipment weights that stress floor loading. Getting it right requires experience that can’t be accelerated.
Whether you’re building a new data center suite, deploying AI/GPU infrastructure, or upgrading
telecom infrastructure, our installation teams average over 25 years of direct experience in telecom central offices,
enterprise data centers, and high-density colocation facilities.
How we Work
We approach every deployment as a mission-critical operation. Execution follows detailed Methods of
Procedure developed during the design phase. Every step is documented. Every deviation is flagged
and resolved before proceeding.
We self-perform across all trades because quality control matters more than cost optimization. Our Austin AI
infrastructure project—10MW, 400 racks, 16 weeks—was delivered with zero safety incidents and zero
callbacks. That outcome isn’t luck. It’s process.
Sevices
Fit-Ups & Build-Outs
- Data center suite fit-ups
- Hot/cold aisle containment
- Environmental and HVAC systems
Rack, Stack & Cabling
- Equipment installation up to 40kW+ per-rack configurations
- Structured cabling—Copper and fiber to BICSI standards
Power Distribution
- AC power systems—PDU installation, busway, switchgear
- DC power systems—Battery plants, rectifiers
AI & High-Density Infrastructure
- Direct-to-chip liquid cooling
- High-density power distribution—40kW+ per rack
- GPU cluster deployment—NVIDIA H100/H200
Frequently asked Questions
What certifications do your installation teams hold?
How do you handle projects with aggressive timelines?
Do you work within existing change management processes?
What's your safety record?
Do you handle equipment procurement, or do we need to source our own?
Project Examples
![]()
Austin TX AI Infrastructure
10MW GPU cluster with ~400 racks of
NVIDIA H100/H200, direct-to-chip liquid
cooling, 40kW/rack density – 16 weeks,
zero safety incidents, zero callbacks.
![]()
Hillsboro OR Datacenter
2.5MW greenfield data center with
25 RPPs and Hot Aisle Containment—
from empty shell to operational
environment in 6 weeks.
![]()
Blanchard ID FTTH
Fiber-to-the-Home network
deployment for underserved
community—120 days from federal
grant award to operational network.