Build & Deploy

From empty space to operational environment—executed to exacting standards.

The Challenge

Infrastructure deployment is where plans meet reality—and where the gap between design intent and field
execution creates lasting problems. A cable tray installed six inches off specification blocks future expansion.
A power circuit terminated without proper torque fails under load.

The pressure to move fast compounds these risks. Business timelines don’t account for the careful,
methodical work that mission-critical infrastructure requires. And the consequences don’t appear
immediately—they surface months or years later.

AI and GPU infrastructure raises the stakes further. Power densities that overwhelm conventional designs.
Cooling requirements that demand liquid distribution where none existed. Equipment weights that stress
floor loading. Getting it right requires experience that can’t be accelerated.

Whether you’re building a new data center suite, deploying AI/GPU infrastructure, or upgrading
telecom infrastructure, our installation teams average over 25 years of direct experience in telecom central offices,
enterprise data centers, and high-density colocation facilities.

How we Work

We approach every deployment as a mission-critical operation. Execution follows detailed Methods of
Procedure developed during the design phase. Every step is documented. Every deviation is flagged
and resolved before proceeding.

We self-perform across all trades because quality control matters more than cost optimization. Our Austin AI
infrastructure project—10MW, 400 racks, 16 weeks—was delivered with zero safety incidents and zero
callbacks. That outcome isn’t luck. It’s process.

Sevices

Fit-Ups & Build-Outs

  • Data center suite fit-ups
  • Hot/cold aisle containment
  • Environmental and HVAC systems

Rack, Stack & Cabling

  • Equipment installation up to 40kW+ per-rack configurations
  • Structured cabling—Copper and fiber to BICSI standards

Power Distribution

  • AC power systems—PDU installation, busway, switchgear
  • DC power systems—Battery plants, rectifiers

AI & High-Density Infrastructure

  • Direct-to-chip liquid cooling
  • High-density power distribution—40kW+ per rack
  • GPU cluster deployment—NVIDIA H100/H200

Frequently asked Questions

What certifications do your installation teams hold?

Our technicians hold BICSI certifications for structured cabling, manufacturer certifications for specific equipment lines, and OSHA safety credentials. For telecommunications work, we maintain TELCORDIA GR-1275 and GR-1502 compliance. Team composition varies by project requirements—we assign personnel based on the specific certifications and experience each engagement demands.

How do you handle projects with aggressive timelines?

Aggressive timelines require upfront investment in planning, not shortcuts during execution. We work with clients to identify true constraints versus artificial deadlines, then build schedules that account for the methodical work that mission-critical infrastructure requires. When timelines genuinely can’t flex, we add resources rather than compress quality steps. Our Austin project delivered 10MW in 16 weeks through parallel workstreams, not shortcuts.

Do you work within existing change management processes?

Yes. We integrate with your change management procedures rather than imposing our own. That means working within your maintenance windows, following your approval workflows, and coordinating with your operations teams. We’ve worked in facilities with everything from informal processes to rigorous ITIL frameworks—the methodology adapts, the quality standard doesn’t.

What's your safety record?

Safety is foundational, not aspirational. Our teams maintain rigorous safety protocols including daily briefings, hazard assessments, and stop-work authority for any team member who identifies a concern. Our Austin AI infrastructure project—a complex, fast-tracked deployment—completed with zero safety incidents. We track leading indicators, not just lagging ones, because preventing incidents matters more than counting them.

Do you handle equipment procurement, or do we need to source our own?

We can work either way. For turnkey engagements, we handle procurement, logistics, and staging—ensuring equipment arrives when needed and is verified before installation begins. For clients who prefer to manage their own procurement, we provide detailed bills of material and coordinate receiving and staging. Many projects use a hybrid approach based on equipment type and client preference.

Project Examples

Austin TX AI Infrastructure

10MW GPU cluster with ~400 racks of
NVIDIA H100/H200, direct-to-chip liquid
cooling, 40kW/rack density – 16 weeks,
zero safety incidents, zero callbacks.

LEARN MORE

Hillsboro OR Datacenter

2.5MW greenfield data center with
25 RPPs and Hot Aisle Containment—
from empty shell to operational
environment in 6 weeks.

LEARN MORE

Blanchard ID FTTH

Fiber-to-the-Home network
deployment for underserved
community—120 days from federal
grant award to operational network.

LEARN MORE